Meridian Flow | Public planning worksheet
Make missing water-project proof visible
Use this outline to discuss a project that an authorized partner has actually identified. It is not a grant application, engineering opinion, funding-eligibility determination or evidence of water savings.
No confidential uploads or submission function. Keep customer records, precise sensitive infrastructure locations, SCADA details and restricted operational data in the agency's approved environment. Tribal priorities, data authority and sovereignty require the relevant community's own decisions.
1. Authority, project and prior plan
- Partner type, authorized sponsor, project owner, decision authority and eligible applicant status: confirmed or unknown.
- Named project, location at an approved level of detail, scope and implementation objective.
- Existing conservation, drought, capital or water-management plan: title, version, page reference and how the project fits.
- Supply exposure relevant to the project: CAP, groundwater, SRP, reclaimed water or stored credits. Use cited partner records; do not infer an agency's position.
2. Systems and evidence inventory
| Record group | Questions to resolve |
|---|---|
| AMI, billing and production meters | Time periods, units, meter coverage, customer-class definitions, missing reads and calibration evidence. |
| Delivery, turnout, canal and lateral records | Measured versus estimated quantities, flow measurement method, losses versus transfers, and responsible data owner. |
| Irrigation, crop and field records | Acreage, crop, season, weather/ET assumptions, method, schedule, soil-moisture coverage and agronomic oversight. |
| GIS, asset and operational systems | Which records are necessary, which must stay inside the agency, who may access them and which exports are approved. |
| Plans, engineering and funding documents | Design assumptions, maps at an approved sensitivity level, estimates, cost share, environmental/procurement obligations and previous commitments. |
For every material record, note owner, system of record, source/version, dates, sensitivity, permitted use, missing fields and any disagreement. A public pattern is not a fact about this partner.
3. Savings and measurement status
- Define the accounting boundary and distinguish gross diversions, delivered water, consumptive use, recoverable flows and claimed savings as applicable.
- Record a defensible baseline, comparison period, unit conversions, meter uncertainty and normalization for acreage, crop, weather and operational changes.
- Name the counterfactual/comparison method, independent engineering or agronomic reviewer, crop-safety stops and verification schedule.
- Keep water and pumping-energy effects separate. A reduction in one measured quantity does not automatically prove basin-wide conserved water.
No savings percentage or acre-foot result is claimed by this worksheet.
4. Funding and delivery checks
Possible research categories include WaterSMART, USDA, state/local infrastructure and tribal funding. None is asserted open, eligible, awarded or suitable here.
- Current official notice, program/year, eligible applicant and project category, verified deadline/timezone, award limits and cost share.
- Partner-approved budget, estimates, procurement, environmental review, permits, milestones and responsible owners.
- Measurement plan, progress reports, applicable financial reports, final report and any award-specific presentation obligations.
- Missing-proof checklist with owners, due dates and a final authorized review before submission.
5. AI fit and stop decision
Potential assistance: indexing approved documents, checking packet completeness and flagging record mismatches. Not authorized: water-rights decisions, engineering sign-off, autonomous irrigation/control changes, invented savings or transmission of restricted data.
Reference: EPA effective utility management resources. This worksheet is Meridian's educational outline, not EPA endorsement or a substitute for a current solicitation.